Skip to content

Investors

Investor Relations

Programme reporting for AEROGRID® — from Katrick Technologies, commercialized through CP Asia (HK).

Economics

Micro-Wind Solar Hybrid — 25-year economics

Grid power gets dearer every year. An AEROGRID asset's cost per kWh is set the day it is built.

25-year economics — grid power vs AEROGRID LCOE

0.055.08.18.27510152025YearsEnergy cost ($/kWh)$0.277Projected grid power costno AEROGRID$0.086AEROGRID LCOEwithout subsidies$0.059AEROGRID LCOEwith government CAPEX incentives

Grid power costs are projected to more than double over 25 years; the AEROGRID levelised cost is fixed at build and rises only with indexed annual inflation. Figures are programme targets, not guarantees.

Calendar

Programme & financial calendar

Forward-looking milestone dates for the Vanguard Programme. Dates are targets and may move as Commercial Validation results are assessed.

DateEventType
Aug–Sep 2026Commercial Validation Center opens, HuizhouProgramme milestone
Oct–Nov 2026Site & yield assessment windowProgramme milestone
Dec 2026Showcase arrays ship; Bosch Commercial Validation (TRL6) pathwayProgramme milestone
Dec 2026MW purchase-order window opensCommercial milestone
2027MW-scale production queue & commercializationCommercial milestone

Reports & presentations

Reports & publications

AEROGRID® is currently a private programme. Published material is listed below; interim and annual reporting will be added here as it becomes available.

Interim reports, annual reports and results presentations will be listed here by year as they are issued. Further programme material is available on request under NDA.

Request programme material

The Vanguard Programme

What a territory partner holds

Vanguard partners take an exclusive territory position ahead of MW-scale production in 2027.

Unlock US$25M Year-1 new revenue

Exclusive territory partner, revenue economics from deployment year.

25-year compounding service income

Local service partner revenue compounding across the warrantied asset life.

Measurable ESG impact

Firm renewable generation in populated, land-constrained regions.

Key programme figures

$0.08/kWh

Targeted LCOE

$0.07 at MW scale

24/7

Generation window

Wind 24/7, day and night, with daily solar and battery backup

25year

Hands-free service warranty

Auto-renews compounding annually

4×

Energy density

vs. solar panels by area

Definitions

Key metrics

Terminology used across AEROGRID programme reporting.

25-year economics — grid power vs AEROGRID LCOE

0.055.08.18.27510152025YearsEnergy cost ($/kWh)$0.277Projected grid power costno AEROGRID$0.086AEROGRID LCOEwithout subsidies$0.059AEROGRID LCOEwith government CAPEX incentives

Grid power costs are projected to more than double over 25 years; the AEROGRID levelised cost is fixed at build and rises only with indexed annual inflation. Figures are programme targets, not guarantees.

LCOE
Levelised cost of energy. Lifetime cost of building and operating the asset divided by lifetime energy generated, expressed per kWh.
Generation window
The hours per day across which the platform produces power. AEROGRID targets a 24/7 power generating profile by combining turbulent wind with sun-tracking solar.
Energy density
Usable energy generated per unit of installed land area, compared against a solar-panel baseline of equivalent footprint.
Hex Unit
The individual hexagonal ducted panel that houses the oscillating aerofoils. Roughly 12 Hex Units make up a 32kW array.
Showcase Array
A Vanguard partner's first installed AEROGRID array, delivered from December 2026, used to validate local yield and grid connection.
TRL6
Technology Readiness Level 6 — a system prototype demonstrated in a relevant operational environment. The Bosch Commercial Validation pathway targets TRL6 in December 2026.

Corporate governance

Governance

Programme governance sits across the technology owner and the commercial entity.

Technology owner

Katrick Technologies Ltd holds the patents and the AEROGRID® trademark, and owns the engineering roadmap. All patents pending.

Commercial entity

CP Asia (HK) contracts with Vanguard territory partners and holds the service-provider relationship across the 25-year warranty term.

Board composition, committee charters, articles of association and remuneration policy belong in this section. Add them as documents once approved.

Contact IR

Contact Investor Relations

For programme material, Commercial Validation attendance or territory availability, contact the investor relations desk.

Investor relations

CP Asia (HK)
1903, Pico Tower
66 Gloucester Road
Wanchai, Hong Kong
info@aerogrid.org