PoC1 Validation Center opens in Huizhou
The AEROGRID® proof-of-concept validation window is now open, running through September 2026, with Vanguard partners invited to attend on site.
Distributed renewable energy
AEROGRID® Micro-Wind Solar Hybrid
A breakthrough hybrid platform built on patented aerodynamic technology — harvesting the turbulent ground-level wind that exists across most of the populated world, and pairing it with sun-tracking solar for a near-continuous 24-hour profile.

Modular arrays deploy along runways, highways, industrial sites and urban edges — land already in use.
$0.08/kWh
Targeted LCOE
$0.07 at MW scale
24/7
Generation window
Wind by night, solar by day
25year
Hands-free service warranty
Auto-renews annually
4×
Energy density
vs. solar panels by area
The challenge
Conventional wind relied on MET data averaged over long intervals — a smooth profile that hides the real energy in ground-level turbulent gusts.
Technology
Zero-rotary aerofoil oscillation with integrated sun tracking. Patented hexagonal ducted panels harvest turbulent ground-wind through rapid aerofoil oscillation — gusts of 4 m/s are abundant across ~80% of the globe.

Economics
AEROGRID® LCOE sits below competing technologies and well below typical grid strike prices — before fuel or grid inflation. PoC1 proves it; the advantage compounds over the asset life.
$0.08
AEROGRID® LCOE/kWh
Hybrid + tracking + minimal battery CAPEX
$0.10
Solar Panel LCOE/kWh
24/7 basis including battery replacement
$0.46
Diesel Generation
Fuel + maintenance dominate lifetime cost
Bankability
A near-continuous generation profile changes what lenders and offtakers will underwrite.
Industrialization
Bosch–Katrick partnership and the CP Asia supply chain take AEROGRID from prototype to validated mass production.
Timeline
The programme runs from PoC1 validation in Huizhou to MW-scale commercialization in 2027.
Q4 2025
Vanguard Programme live — MENA, North America & Asia partners for PoC1
Q1 2026
PoC1 design locked; LCOE modeled to $0.08/kWh hybrid target
Aug–Sep 2026Current
PoC1 Validation Center, Huizhou — execute Vanguard Agreement
Oct–Nov 2026
Site & yield assessment — wind mapping, LCOE, grid plan
Dec 2026
Showcase arrays ship; Bosch PoC1 (TRL6) pathway
2027
MW-scale production queue & commercialization
Investor news
The AEROGRID® proof-of-concept validation window is now open, running through September 2026, with Vanguard partners invited to attend on site.
The Bosch–Katrick industrialization programme sets a December 2026 target for Technology Readiness Level 6, supporting MW-scale production in 2027.
Vanguard territory partners can now reserve Showcase Array delivery slots, with the Vanguard purchase order carrying a $500k deposit against the MW+ MOU.
Profit with purpose
The Vanguard Programme offers exclusive territory partners early access to the 2027 production queue.